Systems Engineering Reports

General Introduction to Microsoft® Exchange Server 2010 Sizing
sponsored by Dell EMC and Microsoft
WHITE PAPER: Review this white paper to explore the latest architectural improvements in Exchange Server 2010 along with the sizing and server role considerations for this upgrade. In addition, learn more about deployment models and example hardware options.
Posted: 11 Apr 2013 | Published: 11 Apr 2013

Dell EMC and Microsoft

Three imperatives for advancing product and systems development
sponsored by IBM
WHITE PAPER: Delivering increasingly complex and smarter products in less time and at a lower cost requires new strategies and development techniques. Consult this insightful resource to learn how a "systems thinking" approach facilitates consideration of the functional dependencies and interconnections necessary to produce high quality, "smarter" products.
Posted: 06 Nov 2013 | Published: 31 May 2013

IBM

Mobile “systems of interactions” driving business innovation
sponsored by IBM
WHITE PAPER: In order to provide optimal end-user experience across a wide variety of mobile channels, you need to develop engaging applications that perform well through all channels. View this informative resource to explore the challenges of creating applications for "systems of interaction."
Posted: 27 Nov 2013 | Published: 31 May 2013

IBM

Mobile "systems of interactions" driving business process innovation
sponsored by IBM
WHITE PAPER: In this white paper, get an overview of mobile systems, or "systems of interaction", including the business and technological challenges, as well as how these systems impact the application lifecycle.
Posted: 06 Nov 2013 | Published: 31 May 2013

IBM

Systems Engineering Best Practice: Model-based requirement analysis
sponsored by IBM
WHITE PAPER: Access this informative resource to learn how building requirements models can help you verify and validate them before handing them off to the design team. Discover why model-based requirement analysis could be the key to successful systems engineering, and get a set of best practices to start you off on the right foot.
Posted: 08 Nov 2013 | Published: 31 Oct 2013

IBM

Modern Developer Tools for IBM i and Power Systems
sponsored by IBM
WEBCAST: Join us for a demonstration of the Tools and ALM Solutions for the IBM I and Power Systems. Learn how these tools apply to your IT environment and how to identify and use the right tools and modernization strategy.
Posted: 19 Aug 2010 | Premiered: May 13, 2010

IBM

Ten Critical Success Factors for CRM: Lessons Learned from Successful Implementations
sponsored by Oracle Corporation
WHITE PAPER: Customer relationship management (CRM) deployments can be complex and difficult. This white paper provides a checklist of the ten critical success factors for organizations to follow to avoid common pitfalls as they design and deploy their CRM system.
Posted: 16 Jan 2007 | Published: 01 Aug 2006

Oracle Corporation

Integrated Systems and Streamlined Practices Propel New, Responsive IT Organizations
sponsored by IBM
WHITE PAPER: Access this report for Forrester to discover how organizations are responding to the need to transform. Discover some of the challenges faced with the transformation, and how the change is far more fundamental than previously anticipated.
Posted: 26 Nov 2013 | Published: 26 Nov 2013

IBM

Strategies to Capture Greater Value from Systems Engineering
sponsored by IBM
WHITE PAPER: Access this helpful white paper to learn how you can capture greater value from systems engineering by embracing a more holistic approach to manage complexity in both product and process.
Posted: 11 Nov 2013 | Published: 11 Nov 2013

IBM

Initial Investment Payback Analysis: Dell PowerEdge R710 solution vs. Dell PowerEdge 2850 solution
sponsored by Dell, Inc. and Intel®
TEST RESULTS: In this report, we estimate both the number of older solutions each Dell PowerEdge R710 solution can replace and the payback period for replacing those older solutions. One key finding discovered is that each Dell PowerEdge R710 solution can replace up to nine Dell PowerEdge 2850 solutions, and could yield a payback in around 9 months.
Posted: 24 Sep 2009 | Published: 01 May 2009

Dell, Inc. and Intel®